KATPRO Fold Program

image

PRODUCTION : Fabrics produced on woven and bromine machines are sent to raw quality control.

QUALITY CONTROL :Pre-quality checks are carried out here. The fabrics are checked, the meter information is received (with a PEY-402 electronic meter meter meter meter meter meter meter meter meter meter meter meter meter meter when measuring the meter), weighed and weighed in the document file, the barcode label is printed by the batch ID and variant number, sent to the warehouse.

APRE : Unprocessed fabrics are exported to the apra by entering raw stock in the warehouse. In addition, introduction and instruction will be applied, apre customer file will be created, bar code check list is prepared, % of the possibility of pulling the cloth in the apreed is calculated and semi-finished stock input is made and sent to the business. Lead planting, necessary training operations, etc. the operations are carried out and sent to the warehouse and to the quality control of the warehouse.

QUALITY CONTROL OF THE GOODS : This is where a second time is compared with the fabric finish output to check for errors, the return to finish meter is checked and the quality control system is started. The fabric is prepared to fold and a batch number is given. Incorrect areas are identified and marked on the fabric. The fabric map is removed and sent to the fold.

FOLD : Here, the fabrication quality folds according to the fabric map that is out of control. Depending on the fabric map, the required areas are cut and the fabric is folded. The barcode label is printed to the tank.

PACKAGING : Drums are sent to fail in the required exports. Drums fail and are sent to the tank by pressing the bar code label.

FINANCING AND MANAGEMENT : Tracks all these transactions. Receives various reports, reviews orders.

CONSINGMENT : Whether it's a drum or a sack, the Drawlist, the delivery form are organized, the customer is recognized.